Forms and Policy
page updated
10/7/07
.
Links will open in a new browser tab or window, or the documents may
be downloaded
|
| description... |
source... |
Policy |
|
| 6/07 FINAL Draft Master Plan (2.4 MB .pdf) (download
these pdf files, then view & print
with Adobe's
Acrobat Reader) |
Lempster Planning Board and Upper Valley Lake Sunapee
Regional Planning Commission |
| DRAFT
Master Plan, Visioning Workshop (64 KB .pdf) |
Lempster Planning Board and Upper Valley Lake Sunapee
Regional Planning Commission |
| DRAFT
Master Plan, Community Survey (116 KB .pdf) |
Lempster Planning Board and Upper Valley Lake Sunapee
Regional Planning Commission |
| DRAFT
Master Plan, Summary of Goals and Recommendations (136 KB .pdf) |
Lempster Planning Board and Upper Valley Lake Sunapee
Regional Planning Commission |
| DRAFT
Land Use (Zoning) Ordinance (532 KB .pdf) |
Lempster Planning Board and Upper Valley Lake Sunapee
Regional Planning Commission |
| Snow
Removal Policy |
2000, revised 2005 by Selectmen |
| |
|
Forms |
|
| Driveway
Permit application.pdf |
Lempster Planning Board.
Per RSA
236:13, Private driveway connections, including structures
such as culverts, are and remain the responsibility of the landowner.
If any driveway connection
threatens the integrity of a Town road due to plugged culverts,
erosion, etc., the Planning
Board or designee can order the owner to repair it. If the owner
fails to repair, the Town can do the repair and charge
the cost of the repair to the owner.
[essentially: Driveway runoff and culverts are the driveway owner's
ongoing responsibility and liability] |
| |
|
| get
free program for viewing and printing downloaded .pdf files |
Acrobat Reader, from Adobe's web site |